A groundbreaking ceremony for a plant for the manufacture of photovoltaic panels and cells is to take place in the region of Stara Zagora by the end of this year. 15-20 hectares of land will be needed to build the plant and the investor has been working together with the municipality to provide the terrain needed. The new plant will create 350-500 jobs, and with the start of production of photovoltaic cells, their number will go up to 800.
Compiled by Yoan Kolev
Translated and posted by Milena Daynova
In the next 3 to 5 years, Bulgaria will experience a shortage of more than 250,000 specialists with higher education. For the past 8 years, Bulgaria has missed the opportunity, which a number of EU countries have taken advantage of, to conclude an..
The Governing Council of the Bulgarian National Bank (BNB) has ordered banks in the country to apply a minimum set of 6 indicators for monitoring credit standards when granting and renegotiating loans secured by residential real estate . The aim is to..
Regional policies are needed to address imbalances in employment and economic activity levels in different regions of Bulgaria, taking into account the specificities of each region. This is the recommendation of the Council for Economic Analysis study..
In the next 3 to 5 years, Bulgaria will experience a shortage of more than 250,000 specialists with higher education. For the past 8 years, Bulgaria..
+359 2 9336 661